A strange compliment
The joiner on this project has been making things for thirty-one years. Halfway through the fit-out he asked whether he could keep a copy of sheet 402 — the kitchen elevation and its four section details — because he wanted to put it on the wall of his workshop.
I have never been more pleased by anything on a project, and it took me a while to work out why.

What a good drawing actually does
A technical drawing is not a description of a thing. It is a set of decisions taken in advance so that nobody has to take them badly, at speed, on a Thursday afternoon with the client arriving at four.
Sheet 402 answers every question the joiner would otherwise have had to ask: how the carcass meets the floor, what happens where the run turns the corner, which face the shadow gap reads from, and what the tolerance is when the wall is not quite plumb — which it never is.
“I did not have to ring you once. Do you know how rare that is? I usually spend more time on the phone than at the bench.”
Why it matters to the client
None of this is visible in the finished room, and the client will never see sheet 402. What they see is a kitchen that went in on schedule, with a four-and-a-half-metre shadow gap that does not step where two cabinets meet, because the decision about which cabinet gives way was made months earlier by someone who was not in a hurry.
Every hour spent on a technical package is an hour taken out of a decision that would otherwise be made under pressure. That is the whole trade.





